The Challenge:
Besteam Marketing faced rising utility bills due to increasing operational demands. The site required a system that could:
- Maximize energy offset during peak production hours
- Avoid overloading the existing 3-phase infrastructure
- Ensure strong generation despite surrounding industrial buildings
- Deliver long-term savings without disrupting business operations

