The Challenge:
As a heavy-use industrial facility, KH Tyre faced a few challenges in adopting
solar energy, including:
- Ensuring structural integrity of the large roof area before installation
- Coordinating with ongoing factory operations to avoid production downtime
- Managing electrical load balancing across multiple three-phase connections
- Achieving the highest energy yield within TNB’s technical limits under NEM
-
The goal was to implement a high-capacity system that would deliver maximum
savings without disrupting daily business operations.